Built by the community in 1975. Being rebuilt by it again.

Latest update · October 2026

Our pool has a plan. Now let’s build it.

We now have a detailed, professionally costed plan for the new pool and a five-year business plan showing how it can run sustainably. That moves us into a new phase: raising the money to build it.

Our fundraising target £1,093,000 to bring Dartington’s community pool back

Where we are

  • Planning permission granted February 2025, with support from 334 people and no objections
  • Solar panels installed 80 panels and battery storage on the pavilion roof, ready to heat the pool
  • Costs estimated by independent construction cost consultants
  • Business plan complete a five-year plan for running the pool sustainably
  • Fundraising underway we have raised money already and are continuing to raise more through grants, trusts, developer contributions and community support
The detail behind the numbers

£1,093,000 is the independent cost estimate for the pool. It comes from our five-year business plan and covers the full build plus professional fees, a risk allowance, inflation up to opening and VAT. Some costs can’t be known until the project goes out to tender and building starts, so we will keep this page updated as the numbers firm up.

This target is for Phase 1: the pool itself. That covers extending it to 25 metres, a new tougher liner, modern filtration and the pool surrounds. There will be some extra costs on top: the pavilion will need some work so the pool can reopen with suitable changing and access. Phase 2 is the full pavilion refurbishment, with new changing rooms, toilets, a reception area and a café. We will fundraise for it separately.

2028 is our plan, not a promise. There is still a lot to do, from securing the funding to appointing contractors and building. Opening in 2028 depends on how quickly we can raise the money.

Looking forward

Plans for the new pool

The designs have been shaped by years of consultation with the community and key user groups including local schools, Totnes Sub Aqua Club, Bidwell Brook, Lifeworks and The Brook. Inclusivity, sustainability and the environment are at the heart of everything.

Our fundraising target for the pool is £1,093,000. Thanks to Section 106 funding, grants and our own fundraising we have made a good start, but there is a long way to go and every contribution matters.

  • 25-metre swim lanes:extended from 20 metres to allow proper lengths, with room for up to four lanes
  • Warm water:heated by air source heat pumps powered by solar PV on the pavilion roof, with batteries to maximise the energy generated. Read more about our energy systems →
  • Extended season:mid-April into October, with the potential to open all year round
  • Improved shallow end:wide corner steps for families with young children and easier access for everyone
  • Full accessible access:especially important for Bidwell Brook, Lifeworks and The Brook
  • Sub-aqua ready:a thicker liner so Totnes Sub Aqua Club can use their equipment safely
  • Modern changing facilities:non-gendered changing including accessible and family cubicles
  • Sustainable build:excavated earth used to create a Devon bank, UV filtration and automatic dosing to minimise chemical use
Render of the new Dartington swimming pool Render of the new pool pavilion New pool render New pool render New pool render, aerial view New pool plan view
Our history

A pool built by the community, for the community

Dartington Swimming Pool was built by volunteers from the local community over a couple of summers in 1975 and 1976. The playground mounds nearby are partly made from the earth that was excavated to build it.

Since then it has been a thriving hub, with many local families having generations learn to swim here. It is, in every sense, a pool that has been run by the community for the community.

Sadly, in September 2022 the liner badly tore and exposed the rotten underlying structure. The pool was unable to open in its current state and has remained closed since. But the community that built this pool has every intention of building it back.

Read this booklet about the origional build →

The old Dartington swimming pool Swimming at Dartington Community swimming at Dartington Dartington pool Dartington pool Dartington pool archive
Progress

The journey so far

In 2020, a small group of volunteers began thinking about what a pool refurbishment could look like. After consulting 235 local households, researching pool standards and working with architects, here is where we have got to and where we are heading.

2020
Volunteers get to work

A working party forms, consults 235 households, engages schools and user groups, and commissions Andrew Kirby Architects for the pre-planning application.

Sept 2022
Pool closes

The liner tears and exposes the rotten structure underneath. The pool closes and the work to rebuild it steps up.

Feb 2025
Planning permission granted

Full planning permission for the new pool, backed by 334 people with no objections.

2025
Solar panels go up

80 solar panels and battery storage are installed on the pavilion roof, ready to heat the new pool. Read about the energy hub →

2026
Costed and planned

Independent construction cost consultants produce a detailed estimate, and a five-year business plan shows how the pool can run sustainably.

Autumn 2026
Fundraising begins

We launch our £1,093,000 fundraising drive, building on money already raised with the help of supporters including the Gibbons Trust, The Normans Family Charity Trust, South West Water and Thrive.

2026–28
Raise the funds, appoint the builders

Grants, trusts, developer contributions and community fundraising, then tendering and construction.

2028
Aiming to reopen

Our target for swimming again at Meadowbrook, if the fundraising goes to plan.

Get involved

Can you help?

This pool was built by volunteers and it will be rebuilt by them too, but we need more hands. We are particularly looking for people with skills in construction and the trades, project management, business planning, fundraising, accountancy, communications and social media. But enthusiasm and time are just as valuable. If you care about this pool, we want to hear from you.

We hold a weekly pool meeting (in person and on Zoom) and new faces are always welcome. Or if you would prefer a more casual introduction, come and find us at one of our events.

Get in touch